MLDEV-Setup
Jun 29 09:00am - Jun 30 09:00am

Jim Rocca with Caitlin McCadden and Tyler Alsup of Professor Rudolf's group. Introductory training. 1H on two samples that were too short - poor shims. 1H on the same two samples with more solvent – excellent shims. Set up and aquire COSY, HSQC, HMBC, and 13-APT on one of those two samples (couple of mg with MW about 300) in CDCl3.